Project overview

The original Flitwick Leisure Centre contained a small 4 lane swimming pool and 55 station fitness room.

Project value
£20,000,000
Project value
Rating
Passivhaus design
Rating
eco-friendly and modern en-suite bedrooms
72
eco-friendly and modern en-suite bedrooms
RIBA Stage
2
RIBA Stage
Heritage Consultants
Bidwells
Heritage Consultants
5 national construction awards
5 Awards
5 national construction awards

As the centre had undergone several extensions since its construction over 30 years ago, it had become inefficient to run and was not big enough for the ever-growing local community.

As such, Central Bedfordshire Council adopted a leisure strategy that set out a vision to improve sporting facilities across the region, with a new venue at Flitwick deemed a top priority. SDC was appointed to construct a new centre on the adjacent playing fields.

The new building contains an 8 lane 25m swimming pool, separate learner pool, a toddler splash area, 4 court sports hall, health and fitness suite for 120 machines, 3 fitness class studios, 2 squash courts, a crèche, indoor climbing wall, wet and dry changing facilities, reception and offices, a café area for light refreshments and a health referral room for wellbeing advice.

Project team

Adam Knaggs

Adam Knaggs

Managing Director

Adam joined SDC in 1995 as a Site Engineer. His position as Managing Director involves contributing to the day-to-day running of the business, setting the strategy for projects, and supporting all departments. Adam’s active approach to problem solving has been a defining trait of his career, as recognised by the Institution of Civil Engineers who honoured him with their Site Engineer of the Year Award 1999, in which he was praised for designing his own shuttering system.

Andrew Shiner

Andrew Shiner

Director

Andy joined SDC as a Site Agent and rose through the ranks to Project Director, before taking on his current role as Board Director in 2020. The experience he gained in all three professions will undoubtedly assist him in leading this scheme. On a previous project for NIAB in Cambridge, Andy’s team were responsible for SDC’s highest Considerate Constructors’ score to date (90 out of 100) and a Runner’s Up Prize at the CCS National Awards in 2019.

Andrew Mitchell

Andrew Mitchell

Director

Andrew is a senior member of staff who holds the role of Director/Company Secretary. He joined SDC in 1994, and had therefore been with the company for almost thirty years. He plays a key role in ensuring that board procedures are both followed and regularly reviewed. The Chairman and Board Directors will look to the Company Secretary for guidance as to what their responsibilities are under the rules and regulations to which they are subject, and on how these responsibilities should be discharged.

Francis Shiner

Francis Shiner

Chairman

Since joining the company in 1983, Francis has assumed various roles, from Chief Surveyor to managing Director, ultimately assuming the position of Chairman in 2021.

Dan Changer

Dan Changer

Director

Dan studied Architecture at the University of Cambridge and worked as a chartered Architect before joining SDC in 2010. Joining as a Design Coordinator, Dan then opted to work as a Contracts Manager, receiving a promotion to Project Manager before his appointment to the Board of Directors in 2020. His duties and responsibilities include setting the overall strategy for the project, as well as leading the project team and ensuring the scheme is delivered within the client’s time, quality and budget constraints. Dan’s client-focused attitude and collaborative problem-solving approach will be crucial to the scheme’s successful delivery.