Projects
We work across sectors and scales
to build progress with our partners.
Project Zeta
One of the UK’s leading science and innovation campuses, and home to over 200 global organisations
Brooklands
Brooklands sustainable business campus in Cambridge represents a remarkable project aimed at meeting the needs of tech businesses.
Project Birchwood
Located next to the Melbourn Science Park, this large-scale development provides technology consultants TTP with three new state-of-the-art buildings.
Lucy Cavendish College
This scheme provides 72 eco-friendly and modern en-suite bedrooms for students studying at Lucy Cavendish College
Babraham R&D 2
The Babraham Research Campus aims to be one of the leading centres for bioscience excellence with an underlying philosophy to cultivate an environment that stimulates effective knowledge exchange and commercialisation.
Project Atria, Cambridge Biomedical Campus
Stands as a beacon of innovation on the Cambridge Biomedical Campus
NIAB East Malling Research (EMR)
This project for NIAB EMR involved a site-wide redevelopment at their East Malling Site to enhance the company’s current operations and improve the working conditions for the employees at the site.
Project Hadar
Project Hadar involved the refurbishment and re-configuration of the four-storey Gleeson building, plus the ground floor and link section of the Department of Pharmacology building.
One Granta, BioMed
One Granta represents a pioneering venture, boasting a cutting-edge speculative laboratory and office edifice
Northampton College
The redevelopment of Booth Lane saw the demolition of the former campus and the construction of a single ‘landmark’ building with associated ancillary development in its place.
Central Spaces
Located in central Cambridge, this project for St Catharine’s College provides modern and integrated facilities, enhancing the experiences of students, staff, and visitors.
Bradfield Centre
The John Bradfield Centre has been designed to encourage collaborative working and innovation
Barton House
The construction of Barton House provides Abingdon Science Park with a new laboratory and office building.
Quad Two, Harwell
Quad Two is the newest landmark building to be constructed on the Harwell Science and Innovation Campus.
ZF Office and Technical Centre, Solihull
Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.
The Optic
The Optic’ provides 95,000 sq ft of flexible workspace and state-of-the-art laboratories, adjacent to the recently completed ARM HQ building.
Unit 1-21, Cambridge Science Park
Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.
Kettle’s Yard Museum
Kettle’s Yard is an art gallery set within four converted Grade II listed cottages
Civil Engineering Building
This project involved the construction of a three storey building for the Civil Engineering department at the west Cambridge campus.
Cokethorpe Changing Pavilion
Cokethorpe Schools new changing pavilion is of timber frame construction, clad in timber panels and finished with a green roof
Quad One
Quad One and the Pavilion. A linear block that comprises three-storeys of accommodation for small and medium enterprises
Dorothy Garrod Building
This project involved the demolition and partial demolition of the Strachey and Fawcett buildings, with a four-storey student accommodation building constructed in its place.
Faringdon Lodge
Faringdon Lodge is a three-storey entrance building that contains teaching and support spaces for the Economics and Computer Science Departments
Fircroft & Fairleigh School Boarding House Refurbishments
This project entailed the refurbishment of two historic boarding houses at Uppingham School.
Cranfield United Football Club
This project for Cranfield Parish council provided a new 3G football pitch and sports pavilion.
Project Gemma
Project Gemma represents a state-of-the-art expansion of the Addenbrooke’s Clinical Research Centre, comprising five floors along with basement and rooftop plantrooms.
Wycombe Abbey School Dormitories
The project provided boarding accommodation for 108 girls and eight members of staff across two houses.
People Performance Centre, Mercedes
The People Performance Centre is a state-of-the-art fitness centre
Harrison Drive Nursery
This project created a contemporary 650 sq.m nursery for Homerton College in Cambridge.
Classic Cars, Jaguar Land Rover
The development of this 14,000 sq.m. state-of-the-art facility allowed all of Jaguar Land Rover’s Classic operations to be consolidated under one roof
The Welding Institute
A comprehensive redevelopment of The Welding Institute’s site to create a series of new structures connected to the main Bevan Braithwaite building by a link street.
Bletchley Leisure Centre
This leisure centre was completed as part of the Bletchley town centre regeneration scheme.
Kimboton Prep School
This project involved the refurbishment and extension of Kimbolton Preparatory School.
Museum of Archaeology and Anthropology
The Museum of Archaeology and Anthropology in Cambridge has one of the most important collections of its kind in the UK.
Capacity Uplift, Jaguar Land Rover
This project involved the involved the construction of two industrial buildings, totaling 64,000 sq.m. in Castle Bromwich.
Cowan Court
Cowan Court is a three-storey student accommodation building with curved elevations.
Flitwick Leisure Centre
The original Flitwick Leisure Centre contained a small 4 lane swimming pool and 55 station fitness room.
Battery Test Facility, Jaguar Land Rover
This newly established facility equips Jaguar Land Rover with a cutting-edge venue for testing electric vehicle batteries. The Battery Test facility in Gaydon empowers JLR to conduct comprehensive destructive testing on live batteries.
Richardson Building
Located on the Cambridge Science Park, this project comprised the construction of a modern four storey development
Sherard Building Refurbishment
Located on the Oxford Science Park, the Sherard Building accommodates four storeys of offices and laboratory space
Simon Sainsbury Centre, Cambridge
Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.
Grove Theatre, Dunstable
This negotiated project provided a major regeneration boost to the heart of Dunstable.
Regional Surge Centre
Design and construction works for a new 60-bed regional Surge Centre and two Nightingale Wards for Addenbrooke’s Hospital.
SOV Ryton, JLR
This project comprised the design and conversion of an existing warehouse building into a new Special Vehicle Operations venue for Jaguar Land Rover
Whipsnade Zoo Main Entrance
This project for Whipsnade Zoo involved the demolition of an existing entrance building to make way for a new, fresh and inviting entry point for visitors.
University Sports Centre
The University Sports Centre in West Cambridge marks the first phase of a comprehensive strategy for enhancing the University of Cambridge’s sporting infrastructure.
Westway Place Botley, Student Accommodation
This block provides one-hundred and eighteen studio apartments for Oxford Brookes University students.
Willen Hospice
This project comprises a two-storey extension to the South of the Willen Hospice site, along with a smaller extension to the West.