SDC

Projects

We work across sectors and scales
to build progress with our partners.

Project Zeta
29.10.2024

Project Zeta

One of the UK’s leading science and innovation campuses, and home to over 200 global organisations

Brooklands
27.11.2024

Brooklands

Brooklands sustainable business campus in Cambridge represents a remarkable project aimed at meeting the needs of tech businesses.

28.10.2024

Project Birchwood

Located next to the Melbourn Science Park, this large-scale development provides technology consultants TTP with three new state-of-the-art buildings.

Lucy Cavendish College
28.10.2024

Lucy Cavendish College

This scheme provides 72 eco-friendly and modern en-suite bedrooms for students studying at Lucy Cavendish College

Babraham R&D 2
06.11.2024

Babraham R&D 2

The Babraham Research Campus aims to be one of the leading centres for bioscience excellence with an underlying philosophy to cultivate an environment that stimulates effective knowledge exchange and commercialisation.

Project Atria, Cambridge Biomedical Campus
28.10.2024

Project Atria, Cambridge Biomedical Campus

Stands as a beacon of innovation on the Cambridge Biomedical Campus

1000 Discovery Drive, Cambridge Biomedical Campus
29.10.2024

1000 Discovery Drive, Cambridge Biomedical Campus

A versatile five-storey multi-occupancy structure, offering approximately 105,000 square feet of office and B1(b) laboratory space within the Cambridge Biomedical Campus.

06.11.2024

NIAB East Malling Research (EMR)

This project for NIAB EMR involved a site-wide redevelopment at their East Malling Site to enhance the company’s current operations and improve the working conditions for the employees at the site.

Project Hadar
15.11.2024

Project Hadar

Project Hadar involved the refurbishment and re-configuration of the four-storey Gleeson building, plus the ground floor and link section of the Department of Pharmacology building.

One Granta, BioMed
29.10.2024

One Granta, BioMed

One Granta represents a pioneering venture, boasting a cutting-edge speculative laboratory and office edifice

Northampton College
07.11.2024

Northampton College

The redevelopment of Booth Lane saw the demolition of the former campus and the construction of a single ‘landmark’ building with associated ancillary development in its place.

Central Spaces
07.11.2024

Central Spaces

Located in central Cambridge, this project for St Catharine’s College provides modern and integrated facilities, enhancing the experiences of students, staff, and visitors.

Bradfield Centre
07.11.2024

Bradfield Centre

The John Bradfield Centre has been designed to encourage collaborative working and innovation

07.11.2024

Aston Martin Wind Tunnel

This ongoing scheme will provide a world-renowned formula one client with a new, state-of-the-art wind tunnel vehicle testing facility

Barton House
06.11.2024

Barton House

The construction of Barton House provides Abingdon Science Park with a new laboratory and office building.

Quad Two, Harwell
29.10.2024

Quad Two, Harwell

Quad Two is the newest landmark building to be constructed on the Harwell Science and Innovation Campus.

ZF Office and Technical Centre, Solihull
28.10.2024

ZF Office and Technical Centre, Solihull

Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.

06.11.2024

The Optic

The Optic’ provides 95,000 sq ft of flexible workspace and state-of-the-art laboratories, adjacent to the recently completed ARM HQ building.

Unit 1-21, Cambridge Science Park
28.10.2024

Unit 1-21, Cambridge Science Park

Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.

Kettle’s Yard Museum
07.11.2024

Kettle’s Yard Museum

Kettle’s Yard is an art gallery set within four converted Grade II listed cottages

Brooklands
07.11.2024

Brooklands

Brooklands sustainable business campus in Cambridge represents a remarkable project aimed at meeting the needs of tech businesses while prioritising sustainability and collaboration

Civil Engineering Building
06.11.2024

Civil Engineering Building

This project involved the construction of a three storey building for the Civil Engineering department at the west Cambridge campus.

Cokethorpe Changing Pavilion
07.11.2024

Cokethorpe Changing Pavilion

Cokethorpe Schools new changing pavilion is of timber frame construction, clad in timber panels and finished with a green roof

Quad One
07.11.2024

Quad One

Quad One and the Pavilion. A linear block that comprises three-storeys of accommodation for small and medium enterprises

Dorothy Garrod Building
06.11.2024

Dorothy Garrod Building

This project involved the demolition and partial demolition of the Strachey and Fawcett buildings, with a four-storey student accommodation building constructed in its place.

Faringdon Lodge
07.11.2024

Faringdon Lodge

Faringdon Lodge is a three-storey entrance building that contains teaching and support spaces for the Economics and Computer Science Departments

Fircroft & Fairleigh School Boarding House Refurbishments
06.11.2024

Fircroft & Fairleigh School Boarding House Refurbishments

This project entailed the refurbishment of two historic boarding houses at Uppingham School.

Hangar 1 & Milestone Building
07.11.2024

Hangar 1 & Milestone Building

In preparation for the RAF’s centenary celebrations in 2018, SDC was tasked with refurbishing Hangar 1 at the RAF Museum in Hendon.

Cranfield United Football Club
07.11.2024

Cranfield United Football Club

This project for Cranfield Parish council provided a new 3G football pitch and sports pavilion.

Project Gemma
07.11.2024

Project Gemma

Project Gemma represents a state-of-the-art expansion of the Addenbrooke’s Clinical Research Centre, comprising five floors along with basement and rooftop plantrooms.

Wycombe Abbey School Dormitories
06.11.2024

Wycombe Abbey School Dormitories

The project provided boarding accommodation for 108 girls and eight members of staff across two houses.

People Performance Centre, Mercedes
07.11.2024

People Performance Centre, Mercedes

The People Performance Centre is a state-of-the-art fitness centre

Harrison Drive Nursery
07.11.2024

Harrison Drive Nursery

This project created a contemporary 650 sq.m nursery for Homerton College in Cambridge.

Classic Cars, Jaguar Land Rover
07.11.2024

Classic Cars, Jaguar Land Rover

The development of this 14,000 sq.m. state-of-the-art facility allowed all of Jaguar Land Rover’s Classic operations to be consolidated under one roof

29.10.2024

Uppingham Cricket Pavilion

The historic cricket pavilion, built in 1923, underwent refurbishment to repair and reinvigorate.

The Welding Institute
08.11.2024

The Welding Institute

A comprehensive redevelopment of The Welding Institute’s site to create a series of new structures connected to the main Bevan Braithwaite building by a link street.

Bletchley Leisure Centre
07.11.2024

Bletchley Leisure Centre

This leisure centre was completed as part of the Bletchley town centre regeneration scheme.

Kimboton Prep School
07.11.2024

Kimboton Prep School

This project involved the refurbishment and extension of Kimbolton Preparatory School.

Museum of Archaeology and Anthropology
07.11.2024

Museum of Archaeology and Anthropology

The Museum of Archaeology and Anthropology in Cambridge has one of the most important collections of its kind in the UK.

New Court, Trinity College
07.11.2024

New Court, Trinity College

The refurbishment of Trinity New Court

Capacity Uplift, Jaguar Land Rover
07.11.2024

Capacity Uplift, Jaguar Land Rover

This project involved the involved the construction of two industrial buildings, totaling 64,000 sq.m. in Castle Bromwich.

Christ Church College, Oxford
08.11.2024

Christ Church College, Oxford

This project for Christ Church College in Oxford comprised two parts, namely the beautiful refurbishment and restoration of the Blue Boar Quadrangle and the conversion of a seventeenth century brew house.

Cowan Court
06.11.2024

Cowan Court

Cowan Court is a three-storey student accommodation building with curved elevations.

Bittesby House Refurbishment
07.11.2024

Bittesby House Refurbishment

The refurbishment of Bittesby House, & Kennels Building

Flitwick Leisure Centre
07.11.2024

Flitwick Leisure Centre

The original Flitwick Leisure Centre contained a small 4 lane swimming pool and 55 station fitness room.

Battery Test Facility, Jaguar Land Rover
07.11.2024

Battery Test Facility, Jaguar Land Rover

This newly established facility equips Jaguar Land Rover with a cutting-edge venue for testing electric vehicle batteries. The Battery Test facility in Gaydon empowers JLR to conduct comprehensive destructive testing on live batteries.

Richardson Building
07.11.2024

Richardson Building

Located on the Cambridge Science Park, this project comprised the construction of a modern four storey development

Sherard Building Refurbishment
07.11.2024

Sherard Building Refurbishment

Located on the Oxford Science Park, the Sherard Building accommodates four storeys of offices and laboratory space

Building 2, Aston Martin
07.11.2024

Building 2, Aston Martin

Building 2 forms a pivotal component of the AMRF1 campus masterplan, enhancing the site's redevelopment

Simon Sainsbury Centre, Cambridge
28.10.2024

Simon Sainsbury Centre, Cambridge

Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.

Grove Theatre, Dunstable
28.10.2024

Grove Theatre, Dunstable

This negotiated project provided a major regeneration boost to the heart of Dunstable.

Regional Surge Centre
07.11.2024

Regional Surge Centre

Design and construction works for a new 60-bed regional Surge Centre and two Nightingale Wards for Addenbrooke’s Hospital.

SOV Ryton, JLR
07.11.2024

SOV Ryton, JLR

This project comprised the design and conversion of an existing warehouse building into a new Special Vehicle Operations venue for Jaguar Land Rover

Whipsnade Zoo Main Entrance
06.11.2024

Whipsnade Zoo Main Entrance

This project for Whipsnade Zoo involved the demolition of an existing entrance building to make way for a new, fresh and inviting entry point for visitors.

University Sports Centre
07.11.2024

University Sports Centre

The University Sports Centre in West Cambridge marks the first phase of a comprehensive strategy for enhancing the University of Cambridge’s sporting infrastructure.

Sidgwick Lecture Block
08.11.2024

Sidgwick Lecture Block

Refurbishing the Sidgwick Lecture Theatre

Westway Place Botley, Student Accommodation
06.11.2024

Westway Place Botley, Student Accommodation

This block provides one-hundred and eighteen studio apartments for Oxford Brookes University students.

Willen Hospice
07.11.2024

Willen Hospice

This project comprises a two-storey extension to the South of the Willen Hospice site, along with a smaller extension to the West.

Quarry Theatre, Bedford
28.10.2024

Quarry Theatre, Bedford

Lorem ipsum dolor sit amet consectetur. In morbi est gravida mo rbi elit. Nec suspendisse ipsum malesuada vivamus pellentesque nunc quisque eget.

The Wolfson Building
07.11.2024

The Wolfson Building

Forming part of the John Radcliffe Hospital complex in Oxford, these two rectangular forms provide purpose-built facilities for the Wolfson Centre

Name
Sector
Client