SDC

Projects

We work across sectors and scales
to build progress with our partners.

Project Hadar
15.11.2024

Project Hadar

Project Hadar involved the refurbishment and re-configuration of the four-storey Gleeson building, plus the ground floor and link section of the Department of Pharmacology building.

06.11.2024

The Optic

The Optic’ provides 95,000 sq ft of flexible workspace and state-of-the-art laboratories, adjacent to the recently completed ARM HQ building.

Babraham R&D 2
06.11.2024

Babraham R&D 2

The Babraham Research Campus aims to be one of the leading centres for bioscience excellence with an underlying philosophy to cultivate an environment that stimulates effective knowledge exchange and commercialisation.

Barton House
06.11.2024

Barton House

The construction of Barton House provides Abingdon Science Park with a new laboratory and office building.

Civil Engineering Building
06.11.2024

Civil Engineering Building

This project involved the construction of a three storey building for the Civil Engineering department at the west Cambridge campus.

06.11.2024

NIAB East Malling Research (EMR)

This project for NIAB EMR involved a site-wide redevelopment at their East Malling Site to enhance the company’s current operations and improve the working conditions for the employees at the site.

The Welding Institute
08.11.2024

The Welding Institute

A comprehensive redevelopment of The Welding Institute’s site to create a series of new structures connected to the main Bevan Braithwaite building by a link street.

One Granta, BioMed
29.10.2024

One Granta, BioMed

One Granta represents a pioneering venture, boasting a cutting-edge speculative laboratory and office edifice

1000 Discovery Drive, Cambridge Biomedical Campus
29.10.2024

1000 Discovery Drive, Cambridge Biomedical Campus

A versatile five-storey multi-occupancy structure, offering approximately 105,000 square feet of office and B1(b) laboratory space within the Cambridge Biomedical Campus.

28.10.2024

Project Birchwood

Located next to the Melbourn Science Park, this large-scale development provides technology consultants TTP with three new state-of-the-art buildings.

Project Zeta
29.10.2024

Project Zeta

One of the UK’s leading science and innovation campuses, and home to over 200 global organisations